Innolux · BOE · HKC · CSOT · LG Display · AUO Quote response per case Cross-border trade · Shenzhen
All products Find by parameter
Markets
Industrial display Commercial display
Featured traits
Wide-temperature LCD High-brightness LCD Wide-temp + high-bright
More
Replacement evaluation Compare models Panel sources About
Language
中文 Request a quote
Home/Replacement evaluation

Read the datasheet. Check the substitute. Then decide.

Submit the original part number, and we evaluate candidate replacements against the datasheets we actually hold: form factor, interface, supply, optical and thermal rows compared item by item, with every gap visible. Equal size and resolution never means a drop-in swap.

Datasheets on file
34 models
Cross-reference
brands.html#xref
Send a replacement case
contact.html
Datasheet reading

Five rows that decide everything.

Operating temperature (TOP). The working range. Everything else about temperature is context.

Absolute maximum ratings. Damage thresholds, never performance promises. If a row here looks better than TOP, that is physics, not a bonus.

Luminance block. Typ, min, test point, duty, warm-up. A typ without conditions is not comparable to another typ.

Backlight section. Built-in or external driver, current, and any derating curve. This is where outdoor-looking claims usually hide.

Revision block. Tentative vs approval. A tentative datasheet can change; our model pages name the revision they were built from.

Module vs open cell

The distinction that changes sourcing, testing and blame.

A module ships with its backlight, chassis electronics and a defined connector set — you drive it and mount it.

An open cell is the panel plus (usually) the backlight assembly, without the system electronics. Brightness is whatever the specified backlight gives; thermal design and the driver board are yours. When a datasheet brightness figure says “with BOE BLU”, that is a measurement condition, not a property of the bare cell.

Sourcing-wise: modules shorten your BOM; open cells lower cost and let the integrator own the optics. Mixing the two up in an RFQ is the most common way a quote comes back wrong.

Replacement checklist

What we verify before calling B a candidate for A.

1. Mechanical: outline, mounting holes, bezel height, connector position.

2. Electrical: supply rails, backlight driver type, power draw at max brightness.

3. Interface: protocol (LVDS mapping VESA/JEIDA, eDP lanes, V-by-One lanes), connector family and pin count — adapters change the project.

4. Optical: resolution, brightness with conditions, contrast, surface treatment.

5. Thermal: operating range covers the installation, not just the minimum.

6. Documentation: revision status of both datasheets; a tentative source is flagged.

Until steps 1-6 are checked against documents (and ideally hardware), “candidate” stays “candidate”. We do not print “direct replacement”.

Have a part number from another supplier? The cross-reference table lives at brands.html#xref.

Evaluation statuses

What each verdict means — and what it does not.

To be evaluated. We received the part number; datasheet comparison has not started or source documents are incomplete.

Candidate replacement. Checked items match on paper. This is a document-level verdict only — it is not compatibility certification.

Needs adaptation. Differences exist that a board or structural change could absorb (adapter board, bracket, firmware timing). Quoted as a project.

Verified under specific conditions. Evaluated and sampled for a named device and conditions. That verdict applies to that case, not to your device by default.

Not recommended. A hard conflict on the checklist (interface family, supply rail, outline). We say why instead of quoting anyway.

Submit the original part

Send the original. We run the checklist.

Model or requirement description and a contact e-mail are required. The more you fill in, the tighter the first evaluation comes back.

We reply per enquiry with the verified candidates and their visible gaps. Evaluation is a service, not a compatibility certification.

Replacement cases

Send the original. Get the checklist filled in.

Original part number, the device it sits in, and what failed — we return the verified candidates with their gaps visible.